Skip to main content
Contact us

Software QA services overview · 2026

The Software QA services overview sets out what IXC handles in the QA practice, the order the work runs in, what each stage delivers, and how teams are staffed.

  • Brochures

01Contents

What is inside

  1. 01Six services in the practice
  2. 02What is in scope and what is not
  3. 03Four stages from start to handover
  4. 04Deliverables by stage
  5. 05Onsite, remote, and tooling

02Who it is for

Where this resource fits

Owners briefing the wider company after a first meeting

The boundary between what is outsourced and what stays inside can be lifted straight into an internal note.

Procurement teams putting suppliers side by side

Deliverables are named per service, so the comparison rows line up across candidates.

Quality leads splitting work between an in-house team and an external one

How responsibility is divided, and what changes hands at handover, is set out item by item.

03Full text

The resource in full

You may quote this in internal material with attribution.

01The six services

IXC offers six services in Software QA. QA outsourcing puts a dedicated team on everything from test strategy through execution, defect management, and the evidence behind a release decision. Pre-release QA reviews a single release candidate within an agreed scope and records the verdict. Test automation moves the regression that repeats on every deploy into automated assets that keep running in the pipeline. Performance and resilience testing turns real usage into a load model and finds where the system stops holding. QA process consulting sets quality criteria, release gates, and automation scope so the practice runs inside development rather than beside it. Vibe-coded app verification looks at services built with generative tools for missing requirements, unhandled paths, and the regression surface a change touches. The six group into three tracks — advisory, delivery, and automation — and connect inside one engagement. Criteria set during advisory carry into delivery, and the cases delivery accumulates become the automation backlog, so nothing is rewritten when the track changes.

02What is taken on, and what is not

What is taken on is behaviour confirmed by execution and the verdict that follows from it: test strategy and scope design, scripted and exploratory execution, defect classification with severity and reproduction steps, and release readiness reporting. What is not taken on carries the same weight. Code is not read and graded for quality. Security certification and compliance fitness are not judged. Defects arrive with severity and reproduction steps attached, and fixing product code stays with the engineering team. The boundary is drawn up front because when what a review is expected to cover differs from what it actually covers, both sides arrive at the close with different documents. Areas that were not covered are written into the same report as the results. A report that leaves the uncovered space blank makes a pass rate read wider than it is. Verdict criteria are agreed before work starts; deciding in advance what counts as a release blocker keeps engineering and the business from reading the same defect differently.

03Four stages from start to handover

The work runs in four stages. Risk assessment reviews product flows against the release date and picks out the points where failure costs most within five business days of starting, delivering a risk map and a verification priority list. Evidence design links requirements, tests, defects, and the release decision into one traceability sheet and fixes the verdict criteria within two weeks of work starts, delivered with the test strategy. Execution and improvement runs verification against the agreed criteria and reports defects and residual risk weekly in the same format, leaving an execution report and a defect register. Handover and adoption transfers the test assets and the way of working to the internal team, with four weeks of follow-up questions after transfer. Reports come as documents with the underlying data; test cases and automation scripts transfer with repository access. The four stages stretch or compress with the contract: a single-build review runs them short, while a multi-release engagement repeats execution and improvement and accumulates assets.

04Verdicts and the release memo

Release verdicts use three fixed terms: ready to release, conditionally ready, and hold. Fixing the three in a document keeps interpretation from drifting in the meeting. The verdict document records results per scenario, the areas that were not covered, any temporary workarounds, and the risk that remains, in one format. When a delay is recommended, it also states what would have to be in place for the question to be reopened. Automation widens execution, but a person owns the verdict. After reviewing the results, the exclusions, the assumptions, and the residual risk, CTO Minkyu Shin signs the release memo. He has worked in product development and QA since 2016, at Tricentis, Unity Singapore, Capgemini Singapore, and SOCAR. The approver reads that single page in the meeting as it stands. The evidence behind it is linked rather than scattered: test cases hang off requirements, defects and fixes off results, approval records off fixes, so the chain can be followed in one line.

05Staffing and tooling

Remote delivery is the default and onsite work is available where it is needed. When the test environment opens only on an internal network, account scope and what may not leave the premises are settled first, and the onsite headcount and duration follow. Headcount and duration differ by project, set by the number of platform and device combinations in scope, the deploy and regression cadence, the time left before release, and whether automation assets exist. Rather than fixing a resident headcount, one lead stays for the length of the contract while execution capacity attaches per phase, so a heavy regression window and a stabilisation window get different sizes. Tooling follows the target: Playwright and Selenium on web, Appium on mobile, JMeter for load generation, chosen against the product's technical makeup. Where an in-house QA team already exists, responsibility boundaries are documented first and severity criteria and reporting formats are unified. Repetitive execution moves to automation and developer tests, and the internal team stays on the work that needs judgement — risk design and exploratory testing.

04Download

Get the brochure and worksheets

Leave your name, company and email to get the PDF and Excel files on this page.

The downloadable PDF and Excel worksheets are in English.

How we handle your details

  1. Purpose: providing this resource and answering related questions
  2. Data collected: name, company or organization, work email, visit source (first page visited, referring site domain, campaign parameters)
  3. Retention: 36 months from the date consent is given

You may decline. Without consent we cannot provide this brochure file.

Used only to provide this resource and answer related questions, then deleted after 36 months.

* Required fields.

File details

Format
PDF + XLSX · English
Length
PDF 7 pages
File publication date
Published
Reading time
10 min
Size
PDF 44 KB · XLSX 41 KB
Terms of use
You may quote it in internal material with attribution.

06Related services

Services on this subject

The services that would take this on as a project.

Next steps

Adoption inquiries

Include the scope you reviewed and the open questions in your inquiry. IXC will explain what we can take on and the next steps.